Skip to Content

Engineering Change Order (ECO) for BOM

by

$ 16.25

17.0 0
Live Preview
Required Apps • Manufacturing (mrp)
• Inventory (stock)
• Discuss (mail)
Technical Name bom_change_version
License OPL-1
You bought this module and need support ? Click here!
https://apps.weodu.com/web/image/product.template/1198/image_1920?unique=000dd1f
version: 17.0

Introduction

The Engineering Change Order (ECO) for BOM module in Odoo streamlines the management of Bill of Materials (BoM) by introducing structured version control and approval workflows. It empowers manufacturing teams to efficiently document, review, and implement BoM changes, ensuring that all product revisions are accurately tracked. This module enhances transparency, reduces errors, and strengthens control over the production process.

Key Features

  • ECO Creation: Easily create Engineering Change Orders directly from the BoM form, detailing the nature and impact of proposed changes.

  • Version Management: Automatically generate new BoM versions upon ECO approval, preserving a complete history of modifications.

  • Approval Workflow: Set up multi-stage approval processes to ensure changes are reviewed and authorized before implementation.

  • PDF Documentation: Generate comprehensive PDF reports for each ECO, capturing changes and approvals for compliance and record-keeping.

  • Controlled Activation: Activate approved BoM versions while archiving previous ones, preventing unauthorized or outdated changes from affecting production.

Benefits

  • Enhanced Traceability: Maintain a clear and detailed record of all BoM changes, facilitating audits and ensuring compliance with industry standards.

  • Error Reduction: Structured workflows and versioning minimize the risk of mistakes and inconsistencies in manufacturing.

  • Improved Collaboration: Teams can collaborate efficiently, with clearly defined responsibilities and approval stages for changes.

  • Consistent Production: Ensure only approved BoM versions are used in production, leading to higher product quality and reduced waste.

Compatibility & Technical Details

  • Odoo Integration: Fully compatible with Odoo’s Manufacturing (mrp) and Inventory (stock) modules.

  • Required Modules: Manufacturing (mrp), Inventory (stock), and Discuss (mail) must be installed.

  • License: Odoo Proprietary License v1.0 (OPL-1).

  • Technical Name: bom_change_version.

  • Installation: Quick installation through the Odoo Apps interface, with no additional configuration needed beyond standard setup.

Odoo Proprietary License v1.0
This software and associated files (the "Software") may only be used (executed,
modified, executed after modifications) if you have purchased a valid license
from the authors, typically via Odoo Apps, or if you have received a written
agreement from the authors of the Software (see the COPYRIGHT file).

You may develop Odoo modules that use the Software as a library (typically
by depending on it, importing it and using its resources), but without copying
any source code or material from the Software. You may distribute those
modules under the license of your choice, provided that this license is
compatible with the terms of the Odoo Proprietary License (For example:
LGPL, MIT, or proprietary licenses similar to this one).

It is forbidden to publish, distribute, sublicense, or sell copies of the Software
or modified copies of the Software.

The above copyright notice and this permission notice must be included in all
copies or substantial portions of the Software.

THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR
IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY,
FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT.
IN NO EVENT SHALL THE AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM,
DAMAGES OR OTHER LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE,
ARISING FROM, OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER
DEALINGS IN THE SOFTWARE.